1 September 1944 |
2 Miles SW of Manre |
H&S Co.
Staff and Service functions.
Co. A
Security for XX Corps Headquarters.
Co. B
Cleared mines, booby traps and ammunition for route GC-26 an
vicinity so St. Leonard. Moving forward with Group column.
Co. C
Moved by motor convoy from 1 mile West of Somme Bionne at 0730
hours and arrived at Charny at 1100 hours.
|
|
2 September 1944 |
1 Mile SE of Nizeville |
H&S Co.
Departed 2 miles SW of Manre at 1520 hours by motor convoy and
arrived 1 mile SE of Nizeville at 1645 hours.
Co. A
Air Port construction at Le Misnil, SW of Chalowa for use by heavy
aircraft mission assigned by Corp Engineer.
Co. B
Departed area 1 ½ miles West of Somme Tourbe at 1430 hours by
motor convoy and arrived at area 2 miles NE of Souhesmes at 1715
hours.
Co. C
Maintaining Treadway bridge and approaches at Bras-pror. Security
for bridge equipment in RR yards at Verdun. Reld 160th Engineer.
GENERAL
Raining, cold, A Company has 1 officer (Pierce) and 2 EM missing
in mission of advance Recon. for XX Corps. Letters and personal
equipment found at Menehould.
|
|
3 September 1944 |
1 Mile SE of Nizeville |
H&S Co.
Staff and Service functions.
Co. A
Left Le-Mensil-Sur-Ogler at 1530 hours by motor march and arrived
1 mile SE of Nizeville at 1800 hours.
Co. B
Departed area 1 ½ miles West of Somme Tourbe at 1430 hours by
motor convoy and arrived at area 2 miles NE of Souhesmes at 1715
hours.
Med. Det.
Departed from Somme Tourbe at 1600 hours by motor convoy and
arrived at present location at 1830 hours.
|
|
4 September 1944 |
1 Mile SE of Nizeville |
H&S Co.
Staff and Service functions. Carrying on extensive reconnaissance
for availability of bridge materials for Co. B bridge job when
needed.
Co. A
Providing security for railroad tunnel and supplies stored in same
location. Located at U326678.. Transporting bridge equipment for
99th Engineer.
Co. B
Assigned mission of constructing Class 40 two-way, class 70
one-way, bridge at site in Verdun, whenever construction becomes
necessary.
Co. C
Located at Bras providing security and maintenance for Treadway
bridge at Bras and security for bridge equipment in railroad yards
at Verdun.
|
|
5 September 1944 |
1 Mile SE of Nizeville |
H&S Co.
Staff and Service functions.
Co. A
Repairing and maintaining Route N-3 between St. Menhold and Verdun
to accommodate Class 70 traffic. Posted bridge signs as directed.
Co. B
Maintaining one security party at existing bridge in Verdun during
hours of darkness.
Co. C
Providing maintenance and security for treadway bridge and
approaches at Charny and security for RR Cars in yards at Verdun.
|
|
6 September 1944 |
1 Mile SE of Nizeville |
H&S Co.
Staff and Service functions.
Co. A
Maintaining N-3 between St. Minihold and Verdun. Making minor
repairs to existing Truss bridges in Verdun providing security for
RR Tunnel at U326678.
Co. B
Repairing RR between Verdun and Chalons (relieved 160th
Engr.) Obtaining "I" beams from blown bridge in Verdun for repair
of RR bridges. Transporting Signal equipment for RR cars at
U278652 to XX Corps Engr. Dp.
Co. C
Providing maintenance and security for treadway bridge and
approaches at U278703 and security for RR cars at U278652.
Water points (1) unit each operating at T380731 and T310779. One
(1) unit attached to 13th Replacement Battalion.
|
|
7 September 1944 |
½ Mile SE of Jarny |
H&S Co.
Company performing usual Staff and Service functions. Departed 1
mile SE of Nizeville at 0745 hours by motor convoy and arrived ½
mile South of Jarny at 2100 hours.
Co. A
Left 1 mile SE of Nizeville at 0800 hours by motor convoy and
arrived 2 miles SE of Jarny at 2000 hours. Morale Excellent. 1
squad cleared vehicles from Route N-53 between Mars and Bexreix.
Co. B
Departed area 2 miles NE of Souhesmes at 0745 hours by motor
convoy and arrived at area ½ mile SE of Jarny at 2100 hours.
Assigned mission of building Treadway bridge at Dornot.
Co. C
Moved by motor convoy from Charny at 0700 hours and arrived at
Jarny 2100 hours. Removing mines from town of Cores and route to
Dornot.
Battalion assigned to XII Corps and attached to 35th
division.
|
|
8-9 September 1944 |
1 ½ Miles SW of Bonnet |
H&S Co.
Staff and Service functions. Departed area ½ miles SE of Jarny at
0830 hours by motor convoy and arrived at new area 1 ½ miles SE of
Bonnet by motor convoy at 1415 hours and arrived 2 miles SW of
Blenod at 1545 hours.
Co. A
Departed ½ mile South of Jarny at 2030 hours by motor convoy,
destination 1 ½ mile SW of Bonnet. Convoy enroute at 2400 hours.
Arrived 1 ½ miles SW of Bonnet at 0530 hours, left at 1400 hours
and arrived 2 miles West of Blenod-Les-Toul at 1700 hours.
Co B
Departed area ½ mile SE of Jarny at 1515 hours by motor convoy and
arrived at Chambley at 1630 hours. Departed from Chambley at 1330
hours by motor convoy and arrived at area 1 ½ mile NE of
Blenod-Les-Toul at 2230 hours. Construct heavy Ponton bridge near
Dornot, Near city of Metz.
Co. C
Made assault crossing of Moselle River. Mission being completed
and company was relieved of assignment at 0300 hours 9 Sept. 44. 9
assault boats were lost, 3 men killed, 12 wounded in action.
Clearing mines and ferrying Infantry across Moselle River.
|
|
9-10 September 1944 |
1 ½ Mile SW of Bonnet |
H&S Co.
Staff and Service functions. Arrived 1 ½ miles SW of Bonnet by motor
convoy at 0500 hours. Departed same by motor convoy at 1415 hours
and arrived 2 miles SW of Blenod-Les-Toul at 1545 hours.
Co. A
Resting and cleaning equipment. Arrived 1 ½ miles SW of Bonnet by
motor convoy at 0530 hours. Left same at 1400 hours and arrived 2
miles West of Blenod-Les-Toul at 1700 hours.
Co. B
Resting and cleaning of equipment. Departed Chambley at 1330 hours
by motor convoy and arrived 1 ½ miles NE of Blenod-Les-Toul at
2230 hours.
Co C
Departed ½ mile South of Jarny by motor convoy at 1800 hours
enroute to destination 2 miles South of Blenod-Les-Toul.
Battalion waiting and resting for further orders.
|
|
10-11 September 1944 |
1 ½ Mile SE of Benny |
H&S Co.
Remained in area 1 ½ mile SW of Blenod-Les-Toul until 1405 at which
time they departed by motor convoy and arrived 1 ½ mile SE of Benny
at 1540 hours. Mag. Center, and S-2 and S-3 left area 1 ½ mile SW of
Blenos-Les- Toul as advance C.P. at 2000 hours and arrived at Benny
at 0300 hours.
Co. A
Left 2 miles West of Blenod-Les-Toul at 2035 hours by motor march,
destination 1 Mile East of Ormes-Et-Ville, Convoy enroute at 2400
hours. Arrived 1 mile East of Ormes-Et-Ville at 0330 hours.
Co. C
Departed 2 miles SW of Blenod-Les-Toul by motor convoy at 2045
hours enroute to destination 2 miles South of Benny. Arrived at
area 2 miles South of Benny at 0330 hours.
Med Det.
Departed from previous location at 2030 hours by motor march and
arrived at area 1 ½ mile SE of Benny at 0300 hours.
Battalion mission was to force two crossings of the Moselle River
in vicinity of Crevechamps. Sites were know as A, B & C Site.
A & C site to be treadway bridge with priority to C Site. B
site was to be Infantry foot bridge. A Company and B Company were
engaged in the construction of this mission. Co. C providing
security with assistance of the 137th Infantry Regt.
Company B had 5 men wounded and 2 men from Med. Det. Wounded.
|
|
11-12 September 1944 |
1 ½ Mile SW of Benny |
H&S Co.
Staff and Service functions.
Co. A
Was assigned the mission of ferrying Infantry across Moselle River
vicinity of Crevechamps.
Co B
Mission was to ferry Infantry across the Moselle River in the
vicinity of Crevechamps, also cleared all approaches in the
vicinity of both bridgeheads of mines.
Co. C
Constructed 130' foot bridge 2 miles South of Crevechamps at
Neuviller-Sur-Moselle. On 12 September, 44 we completed 160'
Treadway bridge, this was the first bridge across the Moselle
River.
|
|
13 September 1944 |
1 ½ Mile SW of Benny |
H&S Co.
Staff and Service functions.
Co. A
Completed Treadway bridge (372 ft. long) across Moselle River at
1200 hours.
Co. B
2nd Platoon constructed Bailey bridge over Canal near
Crevechamp. Remainder of Company resting in Bivouac area.
Co. C
Third platoon maintained bridge and approaches at Neuviller SW of
Moselle. Remainder of Company in Bivouac area resting.
|
|
14 September 1944 |
½ Mile East of Ferrieres |
H&S Co.
Departed 1 ½ mile SE of Benny at 1300 hours by motor convoy and
arrived 1 mile East of Ferrieres at 1500 hours.
Co. A
1st and 3rd platoons waiting to support the
60th Engrs on an assault crossing of the Meurth River,
near Resiers. Left 1 mile East of Ormes-Et-Ville at 1300 hours by
motor march and arrived ½ mile South of Ferrieres at 1430 hours.
Co. B
Departed area 1 mile SE of Benny at 1300 hours and arrived
Ferrieres at 1430 hours. No operations for the day.
Co. C
Disassembled treadway bridge at Neuviller-Sur-Moselle. Departed 2
miles South of Benny at 1300 hours and arrived at Ferrieres at
1530 hours.
Med. Det.
Departed from 1 mile SE of Benny at 1330 hours by motor convoy and
arrived ½ mile SE of Ferrieres at 1500 hours.
|
|
15 September 1944 |
3/4 Mile NW of Rosieres |
H&S Co.
Departed ½ Mile East Ferrieres at 1030 hours by motor convoy and
arrived 3/4 mile NW of Resieres at 1130 hours.
Co. A
Left ½ Mile South of Ferrieres at 1430 hours by motor march and
arrived 1 mile SW of Roseires at 1630 hours.
Co. B
Departed Ferrieres at 0830 hours by motor convoy and arrived at
area 1 mile SW of Rosieree-aux Sahmes at 0930 hours.
Co. C
Departed f rom Ferriers by motor convoy at 1300 hours enroute to
destination 2 miles West of Nancy.
Med. Det.
Departed 1 mile SE of Ferrieres at 0600 hours by motor convoy and
arrived 1 mile SW of Rosieres at 0700 hours.
|
|
16 September 1944 |
3/4 Mile NW of Rosieres |
H&S Co.
Staff and Service functions.
Co. A
Support of 137th Infantry. Made assault crossing across
Meurth River near Laneuville. No casualties. One(1) 2 ½ ton truck
turned over in canal near Fleville. One man bruised slightly. Two
(2) Battalions of Infantry crossed on assault crossing.
Co. B
Rcn for and acquisition of bridge materials between St. Nicholas
and Rosieres. 1st Platoon repaired road near Fleville.
2nd squad, 3rd platoon alerted to clear
mines at Varageville.
Co. C
Construction of Class 70 Bailey bridge across canal in Nancy.
Construction of Class 40 treadway bridge across Meurthe River at
Nancy.
|
|
17 September 1944 |
3/4 Mile NW of Rosieres |
H&S Co.
Staff and Service functions.
Co. A
Support of 137th Infantry crossing of Meurthe. 2nd
and 3rd platoons removed mines from streets at
Art-Sur-Muerthe, 1 squad maintenance of treadway bridge.
Co. B
1st platoon repair and maintenance of canal crossing. 1
squad removed mines from streets at Art-Sur-Muerthe.
Co. C
Construction of class 40 treadway bridge at Nancy. Maintenance of
4 bridges at Nancy. On the night of 17 Sept. Co. C slept in beds
in a German hospital which use to be a French professional school
before the war in Nancy.
|
|
18 September 1944 |
1 Mile South of Moncel |
H&S Co.
Departed 3/4 mile NW of Rosieres by motor convoy at 1810 hours and
arrived 1 mile South of Moncel at 2130 hours.
Co. A
Removal of mines from streets at Art-Sur-Muerthe, maintenance of
treadway bridge. Left 1 mile SW of Rosieres at 1800 hours by motor
march and arrived ½ mile North of Sornville at 2100 hours.
Operated with battalion moving to new destination.
Co. B
Repair and maintenance of canal crossing, removal of mines from
streets at Art-Sur-Muerthe till relieved. Departed area 1 mile SW
of Rosieres at 1800 hours by motor convoy and arrived at area 1
mile North of Sorneville at 2100 hours. Usual camp duties
performed.
Co. C
Departed from Nancy by motor convoy at 1100 hours arrived 3/4 mile
NnW of Rosieres at 1601 hours. Departed from Rosieres at 1830 and
arrived ½ mile South of Mazerulles at 2200. 2nd platoon
maintaining three bailey bridges (300 ft. long) also clearing
mines in vicinity of Nancy.
Med. Det.
Departed 1 mile SW of Rosieres at 1800 hours by motor march and
arrived 1 mile South of Moncel-Sur-Seille at 2200 hours.
Battalion attached to 4th Armored Division - To be
close support of 4th Armored Division.
|
|
19 September 1944 |
1 Mile South of Chateau-Salins |
H&S Co.
Staff and Service functions. S-1, S-2, and S-3 forward echelon.
Co. A
To perform Engineer tasks in support of North column, area of 4th
Armored Division. Removal of obstacles in Chateau Salins, 2nd
platoon of Co. A left ½ mile North of Sorniville at 0930 hours by
motor march and arrived 1 mile South of Chateau Salins at 1035
hours. Morale excellent.
Co. B.
To perform Engineer tasks in support of South column, area of 4th
Armored Division. Departed area 1 mile North of Sorneville and
arrived at area ½ mile North of Fresnes-Saulnois at 1715 hours.
Co. C
Maintenance of 4 bridges in the vicinity of Nancy. 2nd
platoon removed obstacles from MSR, Route N-74. Departed from ½
mile South of Mazerulles by motor convoy at 1000 hours and arrived
at ½ miles West of Salina at 1030 hours. 1st squad of 1st
platoon did some mine sweeping in vicinity of Salins. Rest of
Company stood by for assignment.
|